| When | Post | Tone |
|---|---|---|
| 8d ago | Meta's AI infra strategy is about physics, not just roadmaps. MTIA chips aim for 44% TCO cuts, yet power grid bottlenecks pose the real threat. Analyzing the vertical integration play: https://post… | +1.5 |
| 9d ago | Meta data centre will use 1.8 gigawatts and be connected to Alberta’s power grid, relying heavily on natural gas, creating a massive strain on Alberta’s grid, rapidly ramping up the demand for and … ×2 | -8.0 |
| 8d ago | This is short term. He has been in power 18 months and Alberta’s referendum is this fall Not enough people are talking about massive expansion of Canada’s electricity grid that was announced by Ca… | -1.0 |
| 10d ago | While Alberta risks boxing itself in, Ontario is proving what’s possible when we let innovation lead. We don’t need false dilemmas of "either or;" it is not either renewables or natural gas. A mod… ×2 | +3.0 |
This story's article detail has been archived — the live board keeps only
a recent window of data-days. Its articles are preserved in the day
archive (20260709).