| When | Post | Tone |
|---|---|---|
| 9d ago | Entergy wants to spend $30 billion to expand its Louisiana power grid. How much will residents pay? bit.ly/4vBtkyy | -3.0 |
| 9d ago | Entergy wants to spend $30 billion to expand its Louisiana power grid. How much will residents pay? bit.ly/4fm9voS | -2.5 |
| 9d ago | Entergy wants to spend $30 billion to expand its Louisiana power grid. How much will residents pay? bit.ly/4wbuGRS | -2.5 |
| 9d ago | Meta's AI infra strategy is about physics, not just roadmaps. MTIA chips aim for 44% TCO cuts, yet power grid bottlenecks pose the real threat. Analyzing the vertical integration play: https://post… | +1.5 |
| 10d ago | Meta data centre will use 1.8 gigawatts and be connected to Alberta’s power grid, relying heavily on natural gas, creating a massive strain on Alberta’s grid, rapidly ramping up the demand for and … | -8.0 |
| Tier | Title | Category | Source | Feeling | SentimentSentiment Score (-5 to +5) LLM-assessed emotional tone of coverage. -5 = extremely negative/alarming 0 = neutral/factual +5 = extremely positive/hopeful The colored bar shows position on the scale. Emotion badge uses Plutchik's 8 primary emotions: joy, trust, fear, surprise, sadness, disgust, anger, anticipation. |
|---|---|---|---|---|---|
| T3 | Entergy says Meta will save ratepayers billions | power_policy | americanpress.com | beneficial, optimistic, surprising | joy |