LAGOS Dashboard

Live Academic Global Observational Status
as of 8m ago
← Home | Power

AI data centres to add 26.3 GW load by 2031-32, says power ministry; grid stability a concern

7
Articles
6
Unique Sources
9.0
Importance
6.0
Diversity
T2
Top Tier
Snapshot born 1d ago · present at 7 data intervals (1d ago → 1d ago)

Story History

The story across its frozen snapshot generations (each shares ≥ half of this snapshot's articles). articles · sources · squares = generation births, sized by importance (outlined = open that snapshot; filled = this one) · baseline band = intervals the story was live · ticks below = each generation's tone.
Born Articles Sources Importance Shared with this snapshot
1d ago 9 7 11.0 5
1d ago 8 6 10.0 5
1d ago 6 5 8.0 6
1d ago 5 4 5.0 5
1d ago 4 4 4.0 4

Articles in Story

Tier Title Category Source Feeling SentimentSentiment Score (-5 to +5)
LLM-assessed emotional tone of coverage.

-5 = extremely negative/alarming
0 = neutral/factual
+5 = extremely positive/hopeful

The colored bar shows position on the scale. Emotion badge uses Plutchik's 8 primary emotions: joy, trust, fear, surprise, sadness, disgust, anger, anticipation.
T2 AI data centres to add 26.3 GW load by 2031-32, says power ministry; grid stability a concern power_demand indianexpress.com insatiable, looming, strained
-2.2
anticipation
T3 India's power demand rises on heatwaves; IEA forecasts 7% electricity demand growth in 2026 power_demand thehindubusinessline.com strained, surging, urgent
-1.3
fear
T3 India needs 86 GW additional thermal power by FY36, 64 GW under works: Govt power_generation indiatimes.com urgent, pragmatic, weighty
+1.5
anticipation
T3 India's data centre capacity likely to surge 40 pc annually to 12 GW by 2030: Report power_demand ianslive.in growing, strained, opportunity
+0.6
anticipation
T3 Overall peak power demand increased by 12% during April-June, says Union Power Minister power_demand thehindu.com pressured, urgent, strained
+1.2
fear
T3 India Data Centre Capacity to Hit 12 GW by 2030 power_demand newkerala.com expansive, demand-driven, transformative
+0.5
anticipation
T3 AI Data Centre to consume 26.3 GW electricity by FY32: Power Ministry power_demand thehindubusinessline.com alarming, strained, urgent
+1.6
fear