LAGOS Dashboard

Live Academic Global Observational Status
as of 4m ago
← Home | Power

Feds approve $150 million for second power link between Interior and Southcentral Alaska

2
Articles
2
Unique Sources
2.0
Importance
2.0
Diversity
T3
Top Tier
Snapshot born 3d ago · present at 5 data intervals (3d ago → 3d ago)

Story History

The story across its frozen snapshot generations (each shares ≥ half of this snapshot's articles). ─ articles · ─ sources · squares = generation births, sized by importance (outlined = open that snapshot; filled = this one) · baseline band = intervals the story was live · ticks below = each generation's tone.
Born Articles Sources Importance Shared with this snapshot
1d ago 5 5 5.0 1
1d ago 4 4 4.0 1
1d ago 5 5 5.0 1
2d ago 7 7 7.0 2
3d ago 6 6 6.0 2
3d ago 5 5 5.0 2
3d ago 4 4 4.0 2
3d ago 3 3 3.0 2
3d ago 1 1 1.0 1

Articles in Story

Tier Title Category Source Feeling SentimentSentiment Score (-5 to +5)
LLM-assessed emotional tone of coverage.

-5 = extremely negative/alarming
0 = neutral/factual
+5 = extremely positive/hopeful

The colored bar shows position on the scale. Emotion badge uses Plutchik's 8 primary emotions: joy, trust, fear, surprise, sadness, disgust, anger, anticipation.
T3 Alaska delegation announces $150M for Beluga-Healy transmission project power_grid_infrastructure youralaskalink.com investing, promising, vital
+2.1
trust
T3 Feds approve $150 million for second power link between Interior and Southcentral Alaska power_grid_infrastructure sitkasentinel.com reassuring, constructive, connected
+0.4
trust